
|
EQUIPMENT SERVICES |
|
ANNUAL SERVICE* | COMPLETE OVERHAUL** |
|
Regulator System -
First & Second Stage Only (No Octopus) This Service USUALLY Takes 48 Hours |
$20.00 |
$40.00 + Parts |
|
|
Regulator System -
First Stage, Second Stage and Octopus This Service USUALLY Takes 48 Hours |
$20.00 |
$50.00 + Parts |
|
|
Octopus Only (Standard) -
Standard Second Stage Octopus - Note: If yours is "Free-Flowing" it may be your regulators First Stage causing the leak - Please Bring in your Whole Regulator System. This Service USUALLY Takes 48 Hours |
$5.00 | $10.00 + Parts | |
| Octopus Only
(Integrated) -
Integrated Second Stage Octopus - Serves as both Inflator & Octopus (i.e. Scubapro's "Air 2"). Note: If yours is "Free-Flowing" it may be your regulators First Stage causing the leak - Please Bring in your Whole Regulator System. This Service USUALLY Takes 48 Hours |
$5.00 | $15.00 + Parts | |
|
Buoyancy Jacket (B.C.) -
Any Standard Style Buoyancy Control Device including Jacket Style, Back Inflation Style, or "Horse Collar " Style. Price does not include "Integrated Octopus" Service listed Above. This Service USUALLY Takes 48 Hours |
$10.00 | $15.00 + Parts | |
| Gauges (Accuracy
Test)
-
Pressure, Depth or Compass Accuracy Checks are "Annuals" per item and are not conducted unless specifically requested - Rebuilds, if possible are listed as "Overhauls". This Service USUALLY Takes 48 Hours |
$10.00 | $15.00 + Parts | |
|
Computers (Battery Changes & Accuracy Test) -
Pressure & Depth Gauge Accuracy Checks are "Annuals" per item and are not conducted unless specifically requested - Battery Changes are for Labor Only, Batteries are Extra. Call for Quote. This Service USUALLY Takes 48 Hours |
$10.00 | Ask for Quote | |
| *ANNUAL SERVICE - This Service is what is REQUIRED BY THE MANUFACTURERS to keep your Lifetime Warranty Valid. It is also Recommended by Pacific Wilderness since your Gear is "LIFE SUPPORT EQUIPMENT". An Annual Service Includes a Complete System Pressure Check, Cleaning and Safety Check to make sure your gear is performing within Manufacturers Specs. If your Gear does not pass this Check and requires an Overhaul, we will do so and you will be charged the Overhaul Rate Only (Not for the "Annual"). If you do not wish to Overhaul the system, we will need to charge you for the Annual and your system will be returned "AS IS". | |||
| **COMPLETE OVERHAUL - This Service is what is NECESSARY to keep your Gear Safe. A Complete Overhaul Includes Disassembly of your Whole System, Ultrasonic Cleaning of all Parts, Replacement of all Recommended O-Rings / Seats / Parts - Reassembly, Adjustment and Safety Check to make sure your it is performing within Manufacturers Specs. | |||
|
TANK SERVICES Hydros on Site |
STEEL TANKS | ALUMINUM TANKS | |
| Visual Inspection
(Required Annually) -
Includes Removal of Valve, Inspection Inside & Outside of Cylinder to DOT Standards by a Hazmat Trained Tank Inspector. We will Replace Illegal Burst Discs, Valve to Tank O-rings and additionally Conduct a Visual Eddy Current Test on All Aluminum Tanks. This Service is USUALLY Performed While you Wait |
$5.00 O-Ring & Fill Extra |
$10.00 O-Ring & Fill Extra |
|
|
Internal Cleaning & Visual (Tumbling) -
If your Tank Fails the Visual Inspection above and Requires Internal Cleaning We can do it On Site in San Pedro. The Tumbling Process can take anywhere from 4 to 6 Days - Depending on the severity of the Rust / Corrosion. After Tumbling, your Tank will Receive a New "VIP" Sticker showing it is Clean to DOT Standards. This Service USUALLY Takes 4-6 Days |
$20.00 O-Ring & Fill Extra |
$20.00 O-Ring & Fill Extra |
|
| Hydro Test & Visual
(Required Every 5 Years) -
Every 5 Years your Tank Needs to be Stamped with a New "Hydro" Date by an authorized Hydro Testing Facility. We can do it On Site in San Pedro. The Hydro Testing Process takes Approximately 4 Days - Depending on how many Tanks are sent in by Other Shops and Paintball Companies. After passing its' Hydro Test, your Tank will Receive a New "Hydro" Stamp "VIP" Sticker showing it is Current, Clean and to DOT Standards. This Service USUALLY Takes 4 Days |
$20.00 O-Ring & Fill Extra |
$25.00 O-Ring & Fill Extra |
|
|
Hydro/Tumble & Visual (Required as Needed) -
Every 5 Years your Tank Needs to be Stamped with a New "Hydro" Date by an authorized Hydro Testing Facility. In Addition, if the inside of your Tank needs Cleaning - we'll have to do that as well. The Hydro/Tumbling Process takes Approximately 4-6 Days. After passing its' Hydro Test & Internal Cleaning, your Tank will Receive a New "Hydro" Stamp "VIP" Sticker showing it is Current, Clean and to DOT Standards. This Service USUALLY Takes 4-6 Days |
$35.00 O-Ring & Fill Extra |
$35.00 O-Ring & Fill Extra |
|
| Hydro/Liner Remove
& Visual (Required as Needed) -
Every 5 Years your Tank Needs to be Stamped with a New "Hydro" Date by an authorized Hydro Testing Facility. In Addition, if the inside of your Tank has a Liner - we'll need to Remove it through Heavy Tumbling. The Hydro/Heavy Tumbling Process takes Approximately 6-8 Days. After passing its' Hydro Test & Internal Cleaning, your Tank will Receive a New "Hydro" Stamp "VIP" Sticker showing it is Current, Clean and to DOT Standards. This Service USUALLY Takes 6-8 Days |
$40.00 O-Ring & Fill Extra |
Not Applicable |
|
|
Hydro Test Fiber Wrap Tanks (SCBA & Paintball) (Required Every 3
Years) -
Every 3 Years your Fiber Wrapped Paintball or Surface Supplied Air Tank Needs to be Stamped / Stickered with a New "Hydro" Date by an authorized Hydro Testing Facility. We can do it On Site in San Pedro. The Hydro Testing Process takes Approximately 4 Days - Depending on how many Tanks are sent in by Other Shops and Paintball Companies. After passing its' Hydro Test, your Tank will Receive a New "Hydro" Stamp / Sticker showing it is Current, Clean and to DOT Standards. This Service USUALLY Takes 4 Days |
$30.00 O-Ring & Fill Extra |
$30.00 O-Ring & Fill Extra |
|
|
OXYGEN COMPATIBLE SERVICES |
COMPLETE OVERHAUL | ||
|
Regulator System (Nitrox / Oxygen Clean) -
First Stage, Second Stage - with or without Octopus. Items are Cleaned to Nitrox / Oxygen Standards.
Just Specify your Use and we'll Clean it accordingly. This Service USUALLY Takes 4 Days |
$50.00 + Parts | ||
|
Tanks
(Oxygen Cleaning) -
Tank & Valve Cleaned and Converted to Oxygen Standards.
This Service USUALLY Takes 4-6 Days |
$50.00 (Includes Parts) / Fill Extra $30 if Tank is New & Purchased from us |
||